Admin message

WARNING! Gitlab maintenance operation scheduled for Monday, 20 April between 12:00 and 14:00 (CET). During this time window, short service interruptions (less than 5 minutes) may occur. Thank you in advance for your understanding.

Integrate the Multichannel Parametric Upmix into the JBM path

The multichannel parametric upmix (active at 7.1.4 with 160kbps) needs to be integrated into the new JBM path provided by contribution 37 (JITTER)

Edited May 15, 2023 by bayers
Assignee Loading
Time tracking Loading