Final material picking script does not include c01 for preliminaries

I noticed that we did not have the c01 references for the DCR testing in the P800-16 preliminaries folder in the dry-run material. I think we did this selection using the scripts, so it seems they need to be updated to include the c01 condition for all the preliminary items.

Assignee Loading
Time tracking Loading