Item generation: incorrect overlap in P800-4 and P800-5
According to table E.4.2 of the latest Test Plan, the overtalk length shuold be +-1.0s.
WARNING! Gitlab maintenance operation scheduled for Saturday, 27 September 2025, from 07:00 AM to 4:00 PM GMT (09:00 AM to 6:00 PM CEST)
According to table E.4.2 of the latest Test Plan, the overtalk length shuold be +-1.0s.