20250317 cleanup
Cleanup of the following switches, as decided 2025-03-11:
Non-BE
-
NONBE_FIX_GSC_BSTR- VA: issue 1264: Fix bitstream synchronization between encoder and decoder in ACELP GSC in OMASA -> accept -
NONBE_1273_ISM_METADATA_COUNTER- VA: issue 1273: fix counter overflow in ISM metadata encoder -> accept -
NONBE_1279_COUNTER_OVERFLOW- VA: issue 1279: Avoid possible overflow of counter st->Nb_ACELP_frames -> accept -
NONBE_FIX_1277_EVS_DTX_HIGH_RATE_THRESHOLD- VA/Eri: issue 1277: Fix Mismatch in DTX high-rate threshold between EVS float and BASOP -> accept -
NONBE_1231_BASOP_819_THRESHOLD_MASA2TOTAL- Nokia: add fix for precision limitation in comparison with masa2total energy ratio threshold to be aligned with BASOP -> accept